Engineering Kenya's First Commercial Oil Production

A phased development approach combining proven technology with innovative solutions for South Lokichar Basin's unique geology—delivering 326 million barrels over 25 years.

20K
bpd
Phase 1: Early Production
2026-2031 | Ngamia & Amosing | 48 Wells
50K
bpd
Phase 2: Full Development
2031+ | Six Fields | CPF Expansion

Development Strategy

Phased Approach to Resource Development

Our two-phase strategy accelerates first oil while optimizing long-term recovery. Phase 1 utilizes Early Production Facilities to gather critical reservoir data, informing Phase 2's full-scale Central Processing Facility design.

Phase 1: Early Production

Accelerated first oil using rental EPFs and existing wellpads. Road transport to KPRL Mombasa provides operational flexibility during data gathering.

  • Target Rate 20,000 bpd
  • Fields Ngamia & Amosing
  • Wells 48 total (24/24)
  • Transport 600 Trucks
  • Timeline Dec 2026 - 2031

Phase 2: Full Development

Optimized development with Central Processing Facility, expanding to all six fields. Rail transport increases efficiency and reduces environmental impact.

  • Target Rate 50,000 bpd
  • Fields All Six Discoveries
  • Facility Central CPF
  • Transport 155 Rail Wagons
  • Timeline 2031+

Basin Overview

Six Discovery Fields

South Lokichar Basin contains six proven oil discoveries with complex fluvial-lacustrine reservoirs from the Lower to Middle Miocene period.

Ngamia Field

Largest discovery with multiple stacked reservoir zones. Key contributor to Phase 1 production with 11 wellpads planned for full development.

Amosing Field

Second major producing field with complex reservoir characteristics. Successful water injection trials completed with 3 wellpads in Phase 1.

Twiga Field

Significant resource potential with integrated development approach. Phase 2 development target connecting to CPF.

Etom Field

Additional discovery for Phase 2 expansion. Extends plateau production period with connection via gathering system.

Agete Field

Strategic location for Phase 2 integration. Reservoir optimization through advanced modeling and completion technology.

Ekales Field

Complementary resource adding to long-term production sustainability. Full integration with CPF infrastructure network.

Infrastructure

Production Flow: Wellpad to Export

Wellpads
24 Production + 24 Injection Wells
EPF/CPF
Separation & Treatment
Transport
Road/Rail to Mombasa
Export
KPRL Storage & Vessel Loading

Advanced Technologies Deployed

Cutting-edge solutions for South Lokichar's unique challenges

3D Seismic Interpretation

ESP Artificial Lift

Hot Water Circulation

Rotary Steerable Systems

Real-time Monitoring

Core Analysis & Modeling

Drilling & Completions

Advanced Well Design

Our well design addresses Lokichar's unique challenges: semi-viscous oil with high pour point, complex reservoir geometry, and low natural pressure requiring artificial lift from day one.
  • 7-inch production casing with L-80 corrosion-resistant materials
  • Electric Submersible Pumps with 3-year average run life
  • Hot water systems for flow assurance and wax management
  • 25-year producing life with planned workovers
  • Water injection at 195 bara for pressure maintenance
Discover More

Midstream

Transportation to Market

1,100 km journey from Lokichar to KPRL Mombasa with phased transportation strategy

Phase 1: Road Transport

Insulated tankers maintain crude at liquid state during 6-day cycle

  • Fleet Size 600 Trucks
  • Daily Volume 20,000 barrels
  • Loading Temp 80°C
  • Route Distance 1,100 km
  • Export Frequency 1 vessel/month

Phase 2: Rail Transport

Railway line to Lokichar (requires GOK support by H2 2030)

  • Daily Wagons 155 Wagons
  • Daily Volume 50,000 barrels
  • Wagon Type Insulated + Heated
  • KPRL Storage 900,000 barrels
  • Export Frequency 2 vessels/month